Home / Assembly & Quality
Assembly & Quality
Cylinder head assembly programmes, component inspection and defined testing requirements.
Cylinder head assembly
Assembly matched to the head configuration
Manufactured and supplier-sourced child parts are brought together against the required cylinder head bill of materials.
- Match the components. Head and child-part references are matched to the approved BOM.
- Prepare and fit. Specified machining is completed; guides, seats, plugs and sleeves are fitted where required.
- Assemble the head. The required valve-train components are fitted to the approved configuration.
- Verify and protect. The agreed checks are completed and the head is protected for packing and dispatch.

Testing
Testing and verification
Testing programmes may include valve seating and sealing checks and cooling-passage leak checks. These are specification-dependent: the method, fixture, conditions and acceptance criteria are agreed for the individual cylinder head programme.
The image illustrates a reference test arrangement only; it does not show installed SJ test equipment.

Quality controls
Measure. Inspect. Verify.
Inspection follows the drawing and manufacturing route, including dimensions, profiles, hardness and runout where applicable.



Drawing review
Requirements, critical features and inspection points are reviewed before a programme starts.
Sample development
New references can be developed against an approved drawing or physical sample.
Inspection records
Inspection records and product validation at the level agreed for the programme.
Enquiries
Assembly or inspection requirement?
Share the bill of materials, the assembly content, any testing requirement and the quantity.
Send with your enquiry
- Head reference and BOM
- Required assembly content
- Testing requirement
- Inspection requirements
- Quantity